If you want to check the quality and validity of our USGBC LEED-AP-BD-C exam questions, then you can click on the free demos on the website. The free demo has three versions. We only send you the PDF version of the USGBC LEED-AP-BD-C study questions. We have shown the rest two versions on our website.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
Topic 6 |
|
Topic 7 |
|
Topic 8 |
|
Topic 9 |
|
If you feel that you just don't have enough competitiveness to find a desirable job. Then it is time to strengthen your skills. Our LEED-AP-BD-C exam simulating will help you master the most popular skills in the job market. Then you will have a greater chance to find a desirable job. Also, it doesn’t matter whether have basic knowledge about the LEED-AP-BD-C training quiz for the content of our LEED-AP-BD-C study guide contains all the exam keypoints which you need to cope with the real exam.
NEW QUESTION # 41
The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)
Answer: C
Explanation:
A pilot credit identified by the LEED AP that is relevant to the project would be documented in LEED Online as an Innovation Credit. Pilot credits are proposed credits that are used to test and evaluate a strategy before they can be considered for incorporation into the LEED consensus process for approval by USGBC membership1. All other LEED v4 and v4.1 projects may register for pilot credits and pilot ACPs in LEED Online1.
References: Pilot credits and pilot alternative compliance paths (ACPs)
NEW QUESTION # 42
A building owner installs a building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the installation?
Answer: B
Explanation:
This is because:
A building automation system (BAS) is a system that controls and monitors various aspects of a building's operation, such as lighting, heating, ventilation, air conditioning, security, fire alarm, and energy management1.
A BAS can allow programmable load control (PLC), which is the ability to adjust the power consumption of devices or equipment based on a schedule, a sensor, or an event2. PLC can help reduce the energy demand and cost of a building by optimizing the use of resources and avoiding unnecessary or wasteful consumption3.
The LEED AP BD+C V4 credit for Demand Response requires that buildings have a demand response program that can respond to changes in electricity prices or supply by reducing or shifting the demand for electricity4. A BAS can enable such a program by allowing PLC and other features that can modulate the power usage of devices or equipment in response to market signals or internal conditions.
Therefore, installing a BAS to allow PLC can help achieve the Energy and Atmosphere Credit for Demand Response by reducing the energy demand and cost of a building.
NEW QUESTION # 43
For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to
Answer: B
Explanation:
Explanation
According to the LEED v4: Building Design + Construction Guide, the bicycle network must connect to a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary. This is one of the options to meet the requirement for Option 1: Bicycle Network and Storage. The other options are to connect to at least 10 diverse uses or to connect to a school or employment center that is within 3 mi. (5 km) biking distance of the project boundary. References: LEED v4: Building Design + Construction Guide, Location and Transportation Credit: Bicycle Facilities, Option 1: Bicycle Network and Storage1
NEW QUESTION # 44
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?
Answer: B
Explanation:
The Basis of Design (BOD) is a document that describes the design intent and performance criteria for a project. It must include the environmental, energy efficiency and sustainability goals that the project team has established, as well as the strategies and systems to achieve them. The BOD is part of the Integrative Process credit, which aims to foster collaboration and holistic thinking among the project stakeholders from the pre- design phase to the occupancy phase.
References: = [LEED v4: Building Design + Construction Guide], [Integrative Process Calculator],
[Integrative Process credit].
NEW QUESTION # 45
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2).
If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
Answer: C
Explanation:
This option requires the project to increase the breathing zone outdoor airflow by at least 20% above the minimum rates required by ASHRAE 62.1-2010. Therefore, the minimum design zone outdoor airflow is
0.120 CFM/ft2 x 1.2 = 0.144 CFM/ft2.
References: = [LEED v4: Building Design + Construction Guide], [Indoor Environmental Quality Credit:
Enhanced Indoor Air Quality Strategies], [ASHRAE 62.1-2010 User's Manual].
NEW QUESTION # 46
......
They are using outdated materials resulting in failure and loss of money and time. So to solve all these problems, VCETorrent offers actual LEED-AP-BD-C Questions to help candidates overcome all the obstacles and difficulties they face during LEED-AP-BD-C examination preparation. With vast experience in this field, VCETorrent always comes forward to provide its valued customers with authentic, actual, and genuine LEED-AP-BD-C Exam Dumps at an affordable cost. All the LEED AP Building Design + Construction (LEED AP BD+C) (LEED-AP-BD-C) questions given in the product are based on actual examination topics.
LEED-AP-BD-C New Practice Materials: https://www.vcetorrent.com/LEED-AP-BD-C-valid-vce-torrent.html
Tags: Pdf LEED-AP-BD-C Free, LEED-AP-BD-C New Practice Materials, Reliable LEED-AP-BD-C Test Question, Reliable LEED-AP-BD-C Test Pass4sure, LEED-AP-BD-C Passed